Copper Powder Metallurgy FC0205-35 Material Split Sleeve Bearings

Short Description:


Product Detail

Product Tags

Package inner packing: plastic bag
outer packing: carton, pallet
Features Good thermal conductivity property
Can be used in dirty and corrosive environment
Suitable for high static load
iron besed high temperature superconductor
plasticity tenacity,weldability,magnetoconductivity
high precision,small surface roughness no or only a small amount of cutting is needed.material saving,high productivity,product porous,can use with oil,reduce noise and shakes
wet friction properties
Other Terms Quality Standards: ISO9001
Shipment: By Sea / Air
Delivery Terms: FOB,CFR,DDU
Sliding Bearing HS-Code:8483300090

 

 

Our Services

1. We have our own factories that go from raw materials to formingWith synthetic

2. We guarantee the absolute quality of our products, and every step is strictly reviewed

3. We guarantee that the price will be lower than that of other manufacturers when the product quality is up to standard, and the price of the middleman will be competitive

4. We will reply you for your inquiry in 24 hours.

5. After sending, we will track the products for you once every two days, until you get the products. When you got the

goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer the solve way for you.

 

Raw material comply with MPIF standard

1.All material source from Tisco, and other natioanl steel factories

2.Plenty of stock in year round

3.Different raw material providers to make sure fast supply

 

Human based management

1.The average working experience from management board is 15 years

2.Staff turnover less than 10%

3.Engineers with more than 10 years experience

 

FAQ:

Q. What is your terms of delivery?

A: EXW, FOB, CFR, CIF.

 

Q. How about your delivery time?

A: Generally, it will take 20 to 30 days after receiving your advance payment. The specific delivery time depends

on the items and the quantity of your order. and if the item was non standard, we have to consider extra 10-15days for tooling/mould made.

 

 


  • Previous:
  • Next:

  • Write your message here and send it to us